The AACE-PSP Certification Exam is recognized worldwide and is highly valued by employers in the industry. It is a rigorous exam that tests the candidate's knowledge in various areas related to project planning and scheduling. AACE-PSP exam covers topics such as project planning, scheduling techniques, resource management, risk management, and communication management.

 

NEW QUESTION # 25
Theoretically construct a summary activity for activities 6001 through 6003. Identify the governing predecessor and successor activities for the hammock:

  • A. Predecessor is activity 9001, successor is activity 9002
  • B. Predecessor is activity 5001, successor is activity 8002
  • C. Predecessor is activity 4001, successor is activity 8001
  • D. Predecessor is activity 5001, successor is activity 8001

Answer: D


NEW QUESTION # 26
What is the relationship depicted between Activity G and Activity H?

  • A. Finish-to-start.
  • B. Start-to-start.
  • C. You cannot tell with the supplied information.
  • D. Finish-to-finish.

Answer: B


NEW QUESTION # 27
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

  • A. 7 work days
  • B. 8 work days
  • C. 15 workdays
  • D. 18 work days

Answer: B


NEW QUESTION # 28
In its simplest form, what is the main drawback of critical path method scheduling?

  • A. It allows for Precedence Diagramming Method to be used in place of Arrow Diagramming Method.
  • B. It assumes that resources are unlimited.
  • C. It doesn't account for interdependent between activities.
  • D. It requires a backward pass to calculate late dates.

Answer: B


NEW QUESTION # 29
Using the "normal" schedule, if you start Activity 7001 on April 1, 2002, and using a 5-day workweek, what the finish date for Activity 7001?

  • A. 06-18-02.
  • B. 06-05-02.
  • C. 06-04-02.
  • D. 06-11-02.

Answer: B


NEW QUESTION # 30
What method would be the best way to determine the most likely as-built critical path of a project that is underway, and the schedule of which has been partially progressed?

  • A. Use the progressed portion of the critical path of all the updates previous to the current update.
  • B. Interview the project personnel for their perceptions and opinions because the schedule is usually inadequate.
  • C. Use the progressed portion of the critical path of the baseline schedule.
  • D. Use the forward-looking critical path of the most current updates.

Answer: D


NEW QUESTION # 31
Identify the minimum project duration.

  • A. 19 months.
  • B. 16 months.
  • C. 21 months.
  • D. 20 months.

Answer: D


NEW QUESTION # 32
If all other work proceeds according to the Baseline plan, how many times will the critical path change?

  • A. 2.
  • B. 1.
  • C. Does not change.
  • D. 3.

Answer: C


NEW QUESTION # 33
If drafting of the product manual overruns its planned duration by 5 days, how many days may the manufacturing be delayed without affecting release of the product?

  • A. 15 days.
  • B. 5 days.
  • C. 0 days.
  • D. 10 days.

Answer: C


NEW QUESTION # 34
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):

  • A. The delay must affect the critical path.
  • B. The delay must affect the contractor's planned construction schedule.
  • C. The delay must be concurrent with the delay attributable to both parties.
  • D. The delay must not cause monetary harm to the defendant.

Answer: A


NEW QUESTION # 35
Determine the correct formula and date for the late finish for Activity 9004.

  • A. LS.10002 - Lag.7 - l day -> 11-20-03.
  • B. LS.10002 + 1 day -> 11-29-03.
  • C. LS.10002^ Lag.7 + i day -> 11-20-03.
  • D. LS.10002 - 1 day -> 11-27-03.

Answer: C


NEW QUESTION # 36
Using the "normal" schedule, what is the early finish date of activity 10002 and its total float?

  • A. 12-17-03 and 4 days of float
  • B. 12-27-03 and 24 days of float
  • C. 12-18-03 and 4 days of float
  • D. 12-18-03 and 25 days of float

Answer: A


NEW QUESTION # 37
Estimate to complete (ETC) is __________________.

  • A. The expected total cost of an activity, group of activities or the project
  • B. The costs actually incurred in accomplishing the work performed
  • C. The value of the completed work expressed in terms of the budget assigned to that work
  • D. The expected remaining cost needed to complete an activity, group of activities or the project

Answer: D


NEW QUESTION # 38
The work breakdown structure is used to organize

  • A. The smallest defined work packet
  • B. The chart of accounts
  • C. Similar activity coding of schedule activities
  • D. "Smart activity ID codes" representing similar items of scheduled work

Answer: A


NEW QUESTION # 39
Which of the following will always describe the critical path? The path with

  • A. The shortest duration and negative float.
  • B. The longest duration through the network.
  • C. Zero float.
  • D. Negative float.

Answer: C


NEW QUESTION # 40
What problems can a soils engineer deal with on a project?

  • A. Survey error.
  • B. Hidden subsurface conditions.
  • C. Toxic soils.
  • D. Archeological findings.

Answer: B


NEW QUESTION # 41
An early start constraint dictates

  • A. An activity's remaining duration.
  • B. The planned start of an activity.
  • C. The planned start of a successor activity
  • D. The actual start of an activity.

Answer: C


NEW QUESTION # 42
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

  • A. 20 lifts
  • B. 80 lifts
  • C. 5 lifts
  • D. 50 lifts

Answer: D


NEW QUESTION # 43
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?

  • A. Delay manufacturing by 5 days.
  • B. Expedite printing by 5 days.
  • C. Delay product release by 5 days.
  • D. Expedite packaging by 5 days.

Answer: C


NEW QUESTION # 44
What activities are concurrent to Activity 2001 in the "normal" schedule?

  • A. 1001.
  • B. 7001.
  • C. 1000.
  • D. 2003.

Answer: B


NEW QUESTION # 45
Which of the following are NOT considerations or constraints of the planning process for construction scheduling?

  • A. Interest rate of owner's construction bonds.
  • B. Project variables.
  • C. Consideration of all stakeholders.
  • D. Value engineering.

Answer: A


NEW QUESTION # 46
Resource planning must take all of the following into account except for

  • A. Earned value techniques established for the project.
  • B. Cash flow (expenditure) limitations for completing work on the project.
  • C. Time available to complete the project.
  • D. Types of materials, equipment and labor skills required to complete the project.

Answer: A


NEW QUESTION # 47
Which of the following are NOT normally included in the project scope statement, either directly or by reference?

  • A. Project contract between the contractor and owner
  • B. Project justification
  • C. Project deliverables
  • D. Project objectives in terms of cost, schedule and quality measures

Answer: B


NEW QUESTION # 48
Which of the following is NOT true?

  • A. A network must contain only one Critical Path.
  • B. Remaining durations can exceed original durations.
  • C. Multiple calendars can affect the total float calculation.
  • D. Constraints can interfere with the longest path calculation.

Answer: B


NEW QUESTION # 49
......


The PSP certification exam is a rigorous and comprehensive test that covers a wide range of topics related to project planning and scheduling. AACE-PSP exam is designed to evaluate the candidate's ability to apply industry-standard techniques and best practices in the planning and scheduling of projects. AACE-PSP exam covers topics such as project planning, scheduling, progress monitoring, and analysis, as well as cost and risk analysis.

 

AACE-PSP Deluxe Study Guide with Online Test Engine: https://www.test4sure.com/AACE-PSP-pass4sure-vce.html

NEW 2024 Certification Sample Questions AACE-PSP Dumps & Practice Exam: https://drive.google.com/open?id=11txjznBAEHW0Hj4a_bRiW1kn89RIh72A