Free C-TS422-1909 Braindumps Download Updated on Dec 17, 2021 with 91 Questions
SAP C-TS422-1909 Exam Practice Test Questions
SAP C-TS422-1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C-TS422-1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
NEW QUESTION 38
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By material type
- B. By industry
- C. By plant
- D. By period
Answer: C,D
NEW QUESTION 39
How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.
Response:
- A. Reorganize planned independent requirements
- B. Maintain adjustment parameter in the MRP group
- C. Use a planning strategy with requirements consumption
- D. Set the requirements reduction indicator in the requirements class
Answer: A,B
NEW QUESTION 40
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Routing header
- D. Bill of material
Answer: B,D
NEW QUESTION 41
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Purchasing Info Record
- B. Selection Method
- C. Contract
- D. Production Version
Answer: D
NEW QUESTION 42
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.
- A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- B. The number of leading zeros for internal numbers is client-specific.
- C. In Customizing you can decide by material type whether to use the long material number.
- D. The display template for material numbers applies to all clients.
Answer: A,D
NEW QUESTION 43
For what production type are production orders used?
- A. Period and quantity-oriented production
- B. Replenishment controlled by control cycles
- C. Discrete manufacturing processes
- D. Process manufacturing processes
Answer: C
NEW QUESTION 44
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:
- A. It enables the propagation of network alerts across the bill of materials structure
- B. It replaces fixed pegging relationships unless they have been created for stock
- C. It links receipts from an alternative location in case of a shortage in the default location
- D. It propagates changed sales order priorities to the pegged planned orders
Answer: C
NEW QUESTION 45
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Finiteness level (0...1)
- C. Planning mode (bucket/sequence)
- D. Fixed pegging (on/off)
- E. Direction (forward/backward)
Answer: A,C,E
NEW QUESTION 46
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied from the picking list.
- B. The planned order is converted to a production order.
- C. The planned order generates capacity requirements.
- D. The planned order's component availability is checked
Answer: C
NEW QUESTION 47
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Parts interchangeability
- B. Enhanced Kanban Processing
- C. Enhanced characteristics based processes
- D. Equipment and Tools Management
- E. Packaging Logistics
Answer: A,B,E
NEW QUESTION 48
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the order using material requirements planning.
- B. You can reschedule the operation using lead the scheduling.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION 49
What does the bill of material usage (BOM usage) control at the BOM item level?
Response:
- A. Maximum allowed low-level code
- B. Default values for the item status
- C. Allowed material type
- D. Default unit of measure
Answer: C
NEW QUESTION 50
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Group
- C. MRP Controller
- D. Plant Data
Answer: B
NEW QUESTION 51
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Production supply area
- C. Replenishment strategy
- D. Rate routing
Answer: A
NEW QUESTION 52
Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question.
Response:
- A. SAP S/4AHANA Enterprise Management cloud
- B. SAP S/4HANA on premise
- C. SAP S/4HANA Professional services cloud
- D. SAP S/4HANA private cloud
Answer: B,D
NEW QUESTION 53
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:
- A. Vendor consignment
- B. In-house production
- C. Subcontracting
- D. Stock transfer
Answer: B,D
NEW QUESTION 54
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Orders (dispatched) chart
- B. Capacity requirements chart
- C. Work center capacities chart
- D. Order (pool) chart
Answer: B,C
NEW QUESTION 55
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.
- A. Use a specific MRP controller.
- B. Use a specific MRP type.
- C. Use a specific material group
- D. Use a specific material status.
Answer: A,B
NEW QUESTION 56
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:
- A. Flexible Planning
- B. Integrated Business Planning
- C. APO Demand Planning
- D. PP Standard Sales and Operations Planning
Answer: B
NEW QUESTION 57
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:
- A. Material master
- B. MRP profile
- C. Production scheduling profile
- D. Production version
Answer: A
NEW QUESTION 58
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Bulk materials
- B. By-products
- C. Waste products
- D. Continuous flow materials
- E. Co-products
Answer: B,C,E
NEW QUESTION 59
How can you set up the supply source for the SAP Kanban process? Note: There are 3 correct answers to this question.
- A. Using purchasing costs for automated source prioritization
- B. Using quotations for internal and external procurement
- C. Using stock transfer reservations for stock transfer
- D. Using run schedule quantities for in-house production
- E. Using purchase orders for external procurement
Answer: C,D,E
NEW QUESTION 60
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.
- A. Safety stock
- B. Purchase orders
- C. Maximum stock level
- D. Lot size
Answer: A,D
NEW QUESTION 61
When do you use variant bills of materials (BOMB)?
- A. When multiple material is have similar BOMB
- B. When a material has multiple BOMB
- C. When a material has a configurable BOM
- D. When multiple material also have the same BOM
Answer: D
NEW QUESTION 62
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question.
Response:
- A. Individual control recipes
- B. Individual process instructions
- C. Individual operations
- D. Individual phases
Answer: C,D
NEW QUESTION 63
......