[Mar-2022] Verified SAP C_TS422_2020 Bundle Real Exam Dumps PDF
C_TS422_2020 Dumps PDF New [2022] Ultimate Study Guide
SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:
| Passing Score | C_TS422_2020 - 56% C_TS422_1909 - 55% |
| Duration | 180 mins |
| Reference Books | TS421, TS422 (SAP S/4HANA 2020) TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909) |
| Level | Associate |
| Schedule Exam | SAP Training |
| Number of Questions | 80 |
| Exam Price | $550 (USD) |
SAP C_TS422_2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C_TS422_2020 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
NEW QUESTION 40
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By plant
- B. By material type
- C. By industry
- D. By period
Answer: A,D
NEW QUESTION 41
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Supply Network Planning (SNP)
- C. Capacity Requirements Planning (CRP)
- D. Material Requirements Planning (MRP)
Answer: D
NEW QUESTION 42
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.
- A. Workcenter
- B. Customer
- C. Plant
- D. Supplier
Answer: B,C,D
NEW QUESTION 43
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
- A. The Individual/Collective indicator of the component
- B. The Planning Strategy of the finished product
- C. The item category of the component in the BOM
- D. The MRP Type of the component
Answer: A
NEW QUESTION 44
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Scrap percentage
- B. Quantity
- C. Item type
- D. Installation point
Answer: B,D
NEW QUESTION 45
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- B. The number of leading zeros for internal numbers is client-specific.
- C. The display template for material numbers applies to all clients.
- D. In Customizing you can decide by material type whether to use the long material number.
Answer: A,C
NEW QUESTION 46
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirements date occurs before that of a firmed planned receipt
- B. The requirements date occurs that of a firmed planned receipt
- C. The requirement no longer exists
- D. A firmed planned receipt cannot be rescheduled
Answer: A
NEW QUESTION 47
What are pillars of SAP Activate?
There are 2 correct answers to this question.
- A. Guided Configuration
- B. SAP Best Practices
- C. SAP MaxAttention
- D. Premium engagement
Answer: A,B
NEW QUESTION 48
Which task list types can have parallel sequences? There are 2 correct answers to this question.
- A. Rate routings (R)
- B. Reference operation sets (S)
- C. Master recipes (2)
- D. Routings (N)
Answer: A,D
NEW QUESTION 49
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Capacity Requirements Planning (CRP)
- B. Integrated Business Planning (IBP)
- C. Material Requirements Planning (MRP)
- D. Supply Chain Management (SCM)
Answer: B,D
NEW QUESTION 50
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Reduce the planning window.
- B. Form optimum sequences to reduce setup times.
- C. Select an alternative mode on a resource.
- D. Execute a new production planning run.
- E. Adjust the available capacity.
Answer: B,C,E
NEW QUESTION 51
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use the material staging report.
- B. Use the batch information cockpit.
- C. Use batch determination.
- D. Use the material where-used report.
Answer: B
NEW QUESTION 52
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 53
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP controller
- B. MRP planning file
- C. MRP type
- D. MRP group
Answer: A
NEW QUESTION 54
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.
- A. They can be created automatically during month end process.
- B. They can be used for repetitive manufacturing.
- C. They can be applied to make-to-stock production order.
- D. They can be used for manufacturing with collective orders.
Answer: B,C
NEW QUESTION 55
......